HİDROMEK

A test about HİDROMEK

Questions: 9
Time: 15 minutes
Remaining Time: 15:00
1

When was HİDROMEK established?

A
1 April 1978
B
1 May 1978
C
1 April 1976
D
1 May 1976
2

Which of the pairs below are the new demolition excavators of HİDROMEK?

A
HMK 520 LC SB & HMK 235 LCR
B
HMK 800 LC HD & HMK 210 W
C
HMK 410 D HR & HMK 520 LC SB
D
HMK 410 D HR & HMK 310 LC
3

How many new models and products are HİDROMEK exhibiting at Bauma 2025?

A
7
B
9
C
12
D
14
4

How many production facilities does HİDROMEK have in Ankara, Izmir and Thailand?

A
3
B
4
C
5
D
7
5

Which of the following is correct for the maximum reach and maximum payload of HİDROMEK first Telehandler model, HMK 40-18 TH?

A
4 meters and 1.8 tons
B
18 meters and 4 tons
C
14 meters and 2 tons
D
10 meters and 4 tons
6

Which of the following is incorrect about the HİDROMEK SmartLink application, the telematics system developed by HIDROMEK?

A
Easy access to all the important information of the machine, including operation modes, time of usage, location, power mode etc.
B
Usability of the application on smartphones, tablets and computers
C
Access to the fuel consumption and perfromance reports of the machine
D
Lack of information on authorized service and maintenance periods
7

How many times has HİDROMEK, the first and only Turkish machinery manufacturer to be included in the international "Yellow Table" list, been included in the list so far?

A
10
B
9
C
8
D
7
8

Which of the following is the correct operating weight of HMK 800 LC HD, HİDROMEK's highest tonnage excavator?

A
76.100 kg
B
77.800 kg
C
72.400 kg
D
79.500 kg
9

How many international awards does HİDROMEK, which has a Design Studio, have in the field of design?

A
23
B
25
C
35
D
38